top lift

英 [tɒp lɪft] 美 [tɑːp lɪft]

网络  上行程; 天皮

网络



双语例句

  1. The top of this box won't lift ( off).
    这个盒子的盖揭不起来。
  2. There were stairs leading to the top, but Diana and Peter decided to take the lift.
    古塔有楼梯直通塔顶,但戴安娜和彼特决定乘坐电梯。
  3. I sincerely hope that the Ruby APIs on top of Lift expose Lift in a new and better way than the Scala APIs* that one day, the Ruby way will positively influence Lift's Scala APIs.
    我真诚希望Lift之上的RubyAPI能够以一种比ScalaAPI更好的方式将Lift暴露出来,未来某一天,Ruby方式终究会对Lift的ScalaAPI产生积极的影响。
  4. On the top floor ( 8 floors in total with lift), with balcony, Solar roof panel.
    在顶楼(一共8层),有电梯,有阳台,太阳能取暖热水器。
  5. She ( was) whisked up to the top floor in the lift. His boat can only do 10 knot per hour.
    她乘电梯迅速到达顶层.他的船速只能达到10节(时速10海里)。
  6. She ( was) whisked up to the top floor in the lift.
    她乘电梯迅速到达顶层。
  7. A vertical ship lift under earthquake excitation may suffer from a whipping effect due to the sudden change of building lateral stiffness at the top of ship lift towers.
    大坝升船机顶部厂房与底部塔柱结构之间的侧移刚度突变造成了顶部厂房强烈的地震鞭梢效应。
  8. If you are traveling to the ground or top most floor, its better to stand farthest from the elevator doors after you board the lift.
    如果你要去一楼或顶楼,上电梯后,最好站在距离们最远的地方。
  9. From pillar base to the top of the tower a total of1711 steps, the lift has been installed, it is very convenient.
    从塔座到塔顶共有1711级阶梯,现已安装电梯,故十分方便。
  10. The Russian government has called for the world's top ballet to reinstate a ballerina who was fired amid allegations that she was too heavy for male dancers to lift.
    俄罗斯世界顶级芭蕾舞团波修瓦上月开除了该团首席女舞者弗洛契柯娃,原因是她太胖了,男舞伴无法举起她。
  11. The completion of Phase II will see a major transformation and will result in a top quality lift service.
    第二阶段的完成将使得系统完成一个巨大的转变,并将开始提供最高质量的电梯服务。
  12. Asia-based private banks are paying newly hired top bankers up to$ 1m in annual compensation for the first time, in a move that is expected to lift senior pay levels beyond the all-time record set during the dotcom boom.
    总部设在亚洲的私人银行,正首次为新雇用的顶级银行家支付高达100万美元的薪酬,预计此举将使高管薪酬水平超过网络繁荣时期的空前纪录。
  13. Characteristics and applications of top gap slit flow at reversed tainter valve on lock with high lift
    高水头船闸反弧形阀门门顶缝隙流特性及其应用
  14. By taking a real lift ship structure to be built in China as a background, fuzzy control systems of roof MR intelligent isolation system for reducing seismic response of top building of lift ship structure are designed.
    文中并以中国某大坝巨型升船结构为背景,设计了屋盖MR智能隔震系统对升船结构顶部厂房地震反应模糊控制的控制系统。
  15. In this paper, robust control design method of piezoelectric moment controller for the building with uncertain parameters on top of ship lift structure is established. By taking a real ship lift structure built in China as a background, the effectiveness of this method is examined.
    文中建立了压电材料智能力矩控制器对具有不确定参数升船结构顶部厂房地震反应鲁棒控制的设计计算方法,并对中国某升船结构的等效结构体系进行了仿真分析。
  16. Robust control for seismic response of large span building on top of skip lift tower structure with uncertain parameters by piezoelectric force moment controller
    压电材料智能力矩控制器对具有不确定参数升船结构顶部厂房地震反应的鲁棒控制
  17. It is a very important structure of slewing tower crane which joins tower top and other top parts with the mast, and it can revolve 360 ° about the center of the mast to lift the load.
    它下面连接塔身,上部支承塔帽、平衡臂等部件,可使塔式起重机(简称塔机)上部相对于塔身作360度自由回转,以完成各种起重作业要求,是塔机的重要结构系统。
  18. Earthquake resistance analysis of the framed bent on the top of lock head of the Three Gorges project ship lift
    三峡升船机上闸首闸顶排架的抗震分析
  19. Based on the purpose of suppressing the whipping effect of top machinery building of three gorges lift ship structure, roof MR intelligent isolation system is presented.
    为了抑制三峡大坝升船机顶部厂房的地震鞭梢效应,提出了用顶部厂房屋盖MR智能隔震层来减小升船机地震鞭梢效应的方法。
  20. After establishing the mechanical model of intelligent isolation structure system, fuzzy control design methods of seismic response for top building of lift ship structure are developed.
    文中,在建立屋盖智能隔震升船结构计算力学模型的基础上,建立了屋盖MR智能隔震系统对升船结构顶部厂房地震反应模糊控制的设计计算方法。

英英释义

noun

  1. the bottom layer of a heel